Mill Green, Mitcham
This was dis-used Pub, Key activities were as follows:
- Removed all structures accept 4 walls.
- Reposition all floor levels to maximise available space.
- Both sides of building new Extensions were added starting from foundations.
- New drainage system.
- Tarmac Carpark.
- New Basement.
- New Brick Block Structure.
- New roof structure & tiled roof.
The building was completed with the following key features:
- New services “Water, Electric & Gas”.
- Acoustic Walls & ceilings.
- Fire-rated doors.
- Natural Ventilation.
- Video Inter-com.
- Central Heating System.
- Remote door access.
- Communal Dual Satelite-terrestrial-DAB & Telephone lines System.
- Studio flats, 1 bed flats, 2 Bed Flats.
- Shared bathroom & En-Suite.
- Fully Fitted Kitchen.
- Communal Fire Alarm System.
- Smoke & Heat detection in each flat.
- Laminate Floor.
- Concrete Fencing.
- Metal Railing.
- Remote Control Vehicle access gate.
- Paving Slabs.
- Solar Panels etc.